Investment project 450 MW combined-cycle power unit No. 4 |
|
|
|
U.S.-Ukraine Energy Trade and Investment ConferenceINFORMATION ON INVESTMENT PROJECT Project Title: “Installation of 450 MW Power Unit No. 4 with Steam And Gas Turbine-Generator Set at Kharkiv Heating And Power Plant 5 (ТЭЦ-5)”. Kind of Activities to Be Invested: Production of electric and heat power. Way of Investment Attraction: Attraction of credits. Purpose: To increase the output of electric and heat power, to reduce fuel rate for sold electric and heat power. Customers: The electric power is supplied into the wholesale market through Specialized Separate Division «ENERGORYNOK» of National Power Company «UKRENERGO». The shortage of electric power for Kharkiv Region exceeds 500 MW×h. The heat power is supplied to the wholesale buyer — Utility Enterprise «KHARKIV HEAT NETWORKS». The shortage of heat power for Kharkov totals 900 Gkal Competition: The electric and heat powers are competitive products in case of their combined production. At present, the heat power market competitors are heating boilers of «KHARKIV HEAT NETWORKS». In Kharkiv Region Kharkiv Heating And Power Plant 5 (ТЭЦ-5) produces 25% of electric and heat power. Design Capacity:
Investment Volume: US $400,000 thou., including US $154,000 thou. Ukrainian Party contribution. Structure of Investment Expenditures (US $ thou.):
Additional conditions: Expected term of investments repayment: 16.4 years. The output of the produced electric and heat powers depends on the quantity of the supplied gas. The demand for electric power exceeds its supplies. The heat consumption is determined by the wholesale buyer. Availability of Resources:
Payback Warranty: Pledge, bank guarantee, insurance. Project Development Stage: Proposal for Project. Other Information on Project: The introduction of 450 MW Steam And Gas Turbine-Generator Set (ПГУ-450) at HEATING AND POWER P1ANT 5 (ТЭЦ-5) shall provide the planned profitability 20%, fuel rate for production of electric power 230 g/kW×h, fuel rate for production of heat power 140 kg/Gkal. For the purpose of comparison with performance of the Project, it is necessary to point out that Zmiyiv Thermal Power Plant is characterized by fuel rate for production of electric power 360 g/kW×h and the boilers of «KHARKIV HEAT NETWORKS» are characterized by fuel rate for production of heat power 166 kg/Gkal. Customers:
Competition in Kharkiv Region:
Other information: Foundation year: 1979. Foreign participation: Unavailable. |
||
|
|